THE 5-SECOND TRICK FOR ATS SOCOMEC

The 5-Second Trick For ATS Socomec

The 5-Second Trick For ATS Socomec

Blog Article

They've a fully programmable integrated an built-in ATS controller, allowing for automated transfer in between two resources in major/genset or mains/mains applications.

Immediate commissioning ATyS g switches offer considerable time conserving through commissioning (procedure will take two to three minutes). Owing to the design that permits commissioning by way of just four potentiometers and 4 DIP switches, a screwdriver is all of that is necessary to configure the parameters.

A lot more strong The updated design and style features metal mounting legs throughout the overall ATyS variety, strengthening the general robustness of your switches. Furthermore, it will allow an easier and problems-absolutely free mounting of your switches on a back plate with preassembled screws.

Precisely suitable for mains/mains and mains/genset purposes The ATyS g’s built-in controller has actually been meant to deliver unique capabilities for these apps (genset startup, on-load or off-load assessments...) together with the monitoring of your voltage and frequency of both of those resources

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ictibus modit abore, culparum rest harchil luptatem hitiorrum si odi corrovid endiorem aut ulluptaspiet aut pa niet.

Pleasant Grid, storage for integrating renewable energy and islanding, a established fact Solenbat optimises the active Strength performance of buildings Stem, Vitality storage methods for lessened electrical energy billing Paradise, a smart network for your local community Innovation Shut

Remote control interface Precisely designed for installations in which the merchandise is enclosed, the distant interface shows products position around the front panel (D10) or displays and controls with access to programming (D20).

Together with increased electrical performances, ATyS p give a substantial degree of basic safety through the full installation lifecycle.

Security and trustworthiness ATyS p have equally electrical and mechanical interlocks for maximum stability. The 0 situation delivers electrical protection disconnection and enables TSE lockout According to IEC60947-3.

ATyS DT is really a delayed transfer change which has a center-off place enabling total Charge of the time put in disconnected from both incoming sources.

Compact ATSE for easy integration in modular DIN enclosure, custom transfer set up and preventive servicing perform

This relay informs in actual time the user of the product's availability, i.e. whether it is operational and prepared for resource switching.

Assure an final redundancy for unexpected emergency gensets Back again up the complete distribution appropriate up on the important masses Market Close

Journey perform ATyS p M encompasses a purpose for returning on the 0 read more place in the event of the loss of each ability offer sources (tripping). This shields the load from concerns because of resource instability.

Report this page